Is there a way to control the time between tests?

Hi,

Is there a setting in gatling.conf, or elsewhere, that will allow me to control the delay between simulations at a base level?

Thanks,
Christian

How do you launch simulations sequentially? AFAIK, the only supported way is with the maven plugin, and the answer is no, not atm.

For this particular run, yes the simulation run is sequential. Can you point me to the maven way?